|
|||||||||||||||||||||||
DESIGNING THE PROJECT, ARCHITECTURAL WORK, ENGINEERING AND INTERIOR DESIGN Our involvement extends from the moment of the initial idea to the completion of the project. Each project is customised with its own particular style, sensitive to the needs and preferences of each individual client. As a result, we can create very many different and unusual effects, imbuing each scheme with originality, elegance and character.
- Integrated project management (including the best possible architectural design, building construction and infrastructure in order to achieve optimal results) - As far as possible, constraining construction costs - Developing innovative solutions for energy saving through systems based on the most up-to-date energy-efficient and environmentally-friendly architecture, including the use of ecologically-sound materials and technology and designs that take advantage of renewable energy,responsible waste management and clean-air schemes - Recognition of urban renewal issues and adoption if environmentally-friendly engineering installations - Establishing solutions which ensure the lowest running costs for the management and maintenance of the building - Ensuring health and safety on the building site and keeping all working areas clean and tidy On request we can also provide the following services: - In depth discussions to decide on the style and furnishing of the new home including a budgeted list of required items - Provision of 'mood boards' (design and style ideas) - Provision of initial and follow-up reports monitoring progress - Help in the selection of individual items of furnishing, as well as advice about relevant shops and retail outlets - If desired, personally accompanying the client when visiting local craftsmen - Dealing with all email exchanges concerning ideas, designs, models, photos, work progress, etc. - Presenting the necessary forms to the appropriate institutions concerning restoration and/or construction work (for example, SCIA, Permission to build, etc.) |
|||||||||||||||||||||||